Migration plan · 5 steps · 0 stoppages

Migration plan from Petro-Canada to LUBESOLUT

Verifiable technical protocol to change supplier from Petro-Canada Lubricants (HollyFrontier) without stopping production, with documented traceability and guaranteed reversibility.

What you'll achieve migrating from Petro-Canada

15-40% savings

Documented in real migrations — varies by product mix and volume

No production downtime

Phased migration during regular planned maintenance stops

Guaranteed reversibility

Parallel stock + rollback protocol at any phase

ISO 9001 traceability

Complete documentation for purchasing + maintenance audit

The 5 steps of the migration plan

Verifiable protocol to migrate from Petro-Canada Lubricants (HollyFrontier) with traceable documentation and reversibility at any phase.

01

Technical audit of current stock

Mapping of Petro-Canada references in use: quantities, equipment, criticality, required standards. LUBESOLUT technical equivalence table verified case by case.

Week 1-2
02

Bench / pilot equipment validation

Controlled tests with LUBESOLUT product on non-critical equipment for 200-500 h: mechanical compatibility, anti-wear, stability, seals. Post-test analysis confirms equivalence.

Week 3-6
03

Planned phased migration

Progressive equipment-by-equipment changeover during regular planned maintenance stops. No extraordinary production downtime. Parallel Petro-Canada + LUBESOLUT stock during transition for instant reversal if needed.

Month 2-6
04

Monitoring + continuous analysis

Sample analysis every 500-1500 h post-migration: TAN trends, viscosity, particles. Comparison against Petro-Canada historical data to detect deviations early.

Month 4-12
05

Closure + documented traceability

Final migration report with results: actual savings achieved, equivalent compliance verified, traceable documentation for ISO 9001 and purchasing audit. Petro-Canada stock removed from catalogue (or gradual repositioning if remain ratio applies).

Month 12+

Typical risks and how we manage them

Technical honesty: these are the points where a migration can fail and how our protocol anticipates them.

OEM compliance under warranty

If equipment under warranty requires Petro-Canada, wait for warranty expiry before migrating. In the meantime, plan migration for post-warranty.

Thickener compatibility in greases

Some Petro-Canada greases use thickeners incompatible with LUBESOLUT. Documented mechanical flush protocol per critical point before migration.

Existing stock — what to do

Gradual repositioning: use Petro-Canada stock in non-critical applications while validating LUBESOLUT in critical ones. Petro-Canada stock depletes naturally in 3-9 months.

Ready to migrate from Petro-Canada?

Free audit of current stock + commercial proposal + personalized plan. No commitment.